Bill · started in the Commons

High Speed Rail (London–West Midlands) Act 2017

A Bill to make provision for a railway between Euston in London and a junction with the West Coast Main Line at Handsacre in Staffordshire, with a spur from Old Oak Common in the London Borough of Hammersmith and Fulham to a junction with the Channel Tunnel Rail Link at York Way in the London Borough of Islington and a spur from Water Orton in Warwickshire to Curzon Street in Birmingham; and for connected purposes.

Now an Act of Parliament

The story so farThe High Speed Rail (London–West Midlands) Bill was introduced in the House of Commons on 25 November 2013 by Mr Patrick McLoughlin (Conservative). It completed its passage through Parliament and became law as the High Speed Rail (London–West Midlands) Act 2017, receiving Royal Assent on 23 February 2017.

What the bill does

<p>On 25 November 2013 the Government published the High Speed Rail (London-West Midlands) Bill. The Bill confers the powers required to construct phase 1 of the proposed HS2 scheme from London Euston to Birmingham Curzon Street with intermediate stations in West London (Old Oak Common) and at Birmingham Airport. It provides for a connection to the existing rail link to the Channel Tunnel (HS1) but not to Heathrow Airport.</p><p><strong>Key areas</strong></p><ul><li>authorisation of necessary works to construct and maintain phase 1 of the HS2 line (powers to carry out these works are conferred on a nominated undertaker (HS2 Ltd.))</li><li>power to acquire land (and limited rights in land) necessary for the works to be carried out</li><li>deeming of planning permission to be granted for the works</li><li>deregulation of works on HS2 (the disapplication of certain powers contained in other legislation)</li><li>railways matters, essentially the application of existing legislation to HS2 and the future regulatory regime for the line </li><li>facilitating works on conventional lines to integrate them with HS2.</li></ul><p>This is a Hybrid Bill, meaning that it has elements of both a Public and a Private Bill. The Bill was given a Second Reading, therefore those directly and specially affected by the construction of the route were able to petition in front of a specially-convened Select Committee on the Bill.</p><p><strong>Background information: Hybrid Bills</strong></p><p>Further information on how hybrid bills are dealt with in Parliament is available on the Parliament website.</p><ul><li><a>About Parliament: Hybrid Bills</a></li></ul>

Progress through Parliament

  1. 1st reading Commons 25 Nov 2013
  2. Examination for compliance with Standing Orders Unassigned 17 Dec 2013
  3. Examination for compliance with Standing Orders Unassigned 8 Jan 2014
  4. Committee stage Commons 15 Jan 2014
  5. 2nd reading Commons 28 Apr 2014
  6. Money resolution Commons 28 Apr 2014
  7. Ways and Means resolution Commons 28 Apr 2014
  8. Instruction Commons 29 Apr 2014
  9. Carry-over motion Commons 29 Apr 2014
  10. Committee stage Commons 29 Apr 2014
  11. Carry-over motion Lords 8 May 2014
  12. 1st reading Commons 5 Jun 2014
  13. 2nd reading Commons 5 Jun 2014
  14. Carry-over motion Commons 9 Sep 2014
  15. Instruction Commons 9 Sep 2014
  16. 1st reading Commons 28 May 2015
  17. 2nd reading Commons 28 May 2015
  18. Committee stage Commons 28 May 2015
  19. Instruction Commons 23 Jun 2015
  20. Instruction Commons 15 Sep 2015
  21. Instruction Commons 1 Dec 2015
  22. Committee stage Commons 1 Mar to 8 Mar 2016
  23. Report stage Commons 23 Mar 2016
  24. 3rd reading Commons 23 Mar 2016
  25. Carry-over motion Commons 23 Mar 2016
  26. 1st reading Lords 23 Mar 2016
  27. 2nd reading Lords 14 Apr 2016
  28. Carry-over motion Lords 5 May 2016
  29. Committee stage Lords 10 Jan to 12 Jan 2017
  30. Report stage Lords 24 Jan 2017
  31. 3rd reading Lords 31 Jan 2017
  32. Consideration of Lords amendments Commons 20 Feb 2017
  33. Royal Assent Unassigned 23 Feb 2017

Source: the official bill page. Last updated 27 Jun 2025.