Early day motion · EDM 620 · 16 Apr 2024

Re-opening of the Conwy Valley Line

Tabled by Liz Saville Roberts (Plaid Cymru) 4 signatures

The motion

That this House congratulates Network Rail for the swift re-opening of the Conwy Valley Line on 13 April 2024; notes that the line was closed in the afternoon of 9 April 2024 when river flooding washed away ballast that supports the track near Dolgarrog station; further notes the hard work of the Network Rail team to install over 200 tonnes of new ballast which resulted in the resumption of services between Llandudno Junction and Blaenau Ffestiniog; also notes that the latest incident was 0.5 miles from previous resilience work carried out in 2020 and that these works held firm and had they not taken place this latest flooding incident would likely have closed the line for a period of up to four months; and congratulates the team at Network Rail for the vital work they do in operating and maintaining railways for public use in north Wales.

Source: the official Early Day Motions database.