In 2009, as part of the Northern Hub project, the Manchester Piccadilly - Manchester Oxford Road Rail Corridor was set to be quadrupled, with two new platforms (15/16) built at Manchester Piccadilly, yet this project has now been "postponed" indefinitely.
In 2018, the number of trains through the existing corridor (through platforms 13/14) was increased, despite the lack of available capacity, causing constant disruption. Despite this, Transport Secretary Chris Grayling has "postponed" the project indefinitely.

The rail passengers of Manchester and the North deserve better. These new platforms are urgently needed, as the current situation is unacceptable.

Timeline

14 Nov 2018 Petition opened for signatures
14 May 2019 Closed to new signatures

Key facts

Signatures 1,114
Status Closed
Opened 14 Nov 2018
Closed 14 May 2019