Inquiry into the failure of UK train network following power cut on 9 Aug 2019
Closed
42 signatures
What the petition asks
The UK rail network was thrown into chaos by a power cut effecting around 1 million people in England and Wales. Power was quickly restored but trains were stranded for many hours. Thousands of travellers could not complete journeys until noon the following day.
This petition requests an inquiry into the poor performance of the UK rail network and train operators recovering from a power cut on 9/8/19. National Grid limited the impact of the power cut following the rare failure of two power stations in quick succession, but the UK rail network was not resilient enough to recover quickly from the event. In some cases, train operators said their drivers were not trained to reset the trains and needed a technician to do so.
Timeline
| 21 Aug 2019 | Petition opened for signatures |
| 6 Nov 2019 | Closed to new signatures |
Key facts
Signatures
42
Status
Closed
Opened
21 Aug 2019
Closed
6 Nov 2019
Follow this petition
Sign in to get an email when the government responds, a debate is scheduled or held, or the petition closes.
Source: the official petition page. Last checked 15 Jul 2026.