Petition · past parliament

Requisition all #HS2 compounds for emergency #Coronavirus hospital construction

Rejected 21 signatures

What the petition asks

HS2 currently have temporary construction compounds from London to Lichfield. They are cleared, serviced & ideal for temporary & permanent hospital construction near key population centres. Halt HS2 immediately and requisition these sites for emergency NHS & logistical provision.
Current NHS hospital capacity is insufficient even before the Coronavirus emergency. By halting HS2 and requisitioning all the compounds the Government can enable immediate construction of temporary and permanent hospital construction on these sites where needed most without having to source new sites. Enabling works to do this are already done. Sites are cleared and serviced. Road accesses already in place. Modular temporary or permanent construction can be started immediately (BIM technology).

Why it was rejected

It asked for something that is not the responsibility of the UK Government or Parliament.

Since you started this petition, the NHS has announced temporary hospitals. Decisions on sites for hospital construction and logistics support are operational ones for the NHS and not the UK Government or Parliament.

You might like to sign this petition instead:

Halt work on HS2 and Stonehenge Tunnel until Coronavirus over

Timeline

21 Mar 2020 Petition opened for signatures
28 Apr 2020 Rejected by the Petitions Committee

Key facts

Signatures 21
Status Rejected
Rejected 28 Apr 2020

Follow this petition

Sign in to get an email when the government responds, a debate is scheduled or held, or the petition closes.

Source: the official petition page. Last checked 15 Jul 2026.