Petition

Introduce Joined-Up Water Infrastructure Planning Tackle Drought and Flood Risk

Rejected 19 signatures

What the petition asks

Government to require water companies and public agencies to develop a joined-up national strategy for water infrastructure that addresses both drought and flood risk. Investment in reservoirs, sustainable drainage systems, and multi-use water assets such as water courses, quarries, and floodplains.
The UK faces more extreme weather—longer dry spells and heavier rainfall causing flooding. Water infrastructure hasn’t kept pace. Yorkshire’s population has grown by 500,000 since 2000, but no new reservoir has been built since the 1960s. Hosepipe bans are now common, while floodwater and drainage assets remain underused. We need a joined-up national strategy to manage water for both drought and flood resilience—linking reservoirs, canals, floodplains, and quarries into one cohesive system.

Why it was rejected

There was already a petition about this issue. Duplicates are rejected so signatures collect in one place.

The following petition calls for a similar action:

Fund a National Climate Resilience Plan: protect communities from climate impact
Fund a National Climate Resilience Plan: protect communities from climate impact

Timeline

8 Jul 2025 Petition opened for signatures
29 Jul 2025 Rejected by the Petitions Committee

Key facts

Signatures 19
Status Rejected
Rejected 29 Jul 2025

Follow this petition

Sign in to get an email when the government responds, a debate is scheduled or held, or the petition closes.

Source: the official petition page. Last checked 8 Aug 2026.