Petition

Fund modern signalling to reduce delays on the District line's Wimbledon branch

Rejected 21 signatures

What the petition asks

We call on the Government — as owner of South Western Railway (SWR), and through its capital funding settlement for London's railways — to fund modern signalling on the East Putney to Wimbledon line, and to equip SWR's trains to run on it, so this long-neglected branch can finally be upgraded.
While the central District line is being modernised, the East Putney to Wimbledon branch was dropped from the programme and still runs on signalling dating back to the 1980s, with no funded plan to replace it. Modern signalling also needs the trains that share this track — run by South Western Railway, publicly owned since 2025 — to be equipped for it. With both the funding and SWR now in public hands, only the Government can act. It would reduce the daily delays and crowding passengers face.

Why it was rejected

It asked for something that is not the responsibility of the UK Government or Parliament.

We can't accept your petition because the UK Government and Parliament aren't responsible for the issue you raise. It is the responsibility of Transport for London, the Mayor of London and the London Assembly.

The London Assembly has its own petitions process. You can find out more about how to petition the London Assembly here: https://www.london.gov.uk/about-us/london-assembly/petitions

Timeline

26 Jun 2026 Petition opened for signatures
14 Jul 2026 Rejected by the Petitions Committee

Key facts

Signatures 21
Status Rejected
Rejected 14 Jul 2026

Follow this petition

Sign in to get an email when the government responds, a debate is scheduled or held, or the petition closes.

Source: the official petition page. Last checked 27 Jul 2026.